Skip to content

Updated 2026-10-23 · Wells Software Consulting LLC

Full rack vs half rack colocation cost

What a full rack, half rack and 1U cost on published list prices, per U and per kW, and when each one is the right buy.

For a handful of servers, the choice is between buying space by the unit and buying a rack. Published list prices make the per-U math easy, and the power behind the rack decides whether the bigger option is actually better value.

List prices, per U and over 36 months

List prices per U
PlanMonthlyPer U per month36 months with setup
1U$99$99.00$3,664
2U$199$99.50$7,364
Half rack (20U)$799$39.95$29,764
Full rack (40U)$1,400$35.00$51,900

GigeNET, Chicago colocation (published list prices), captured 2026-10-23.

Per U, a full rack costs about a third of a single 1U slot. If you will fill more than half of it within the term, the full rack usually wins, and it gives you room to grow without a second install.

Check the power, not just the space

That full rack comes with dual 20A 120V circuits. At an 80% continuous load, one such circuit carries about 1.9 kW, and with A+B redundancy the second circuit is the backup, not extra capacity. That works out to roughly $729 per usable kW per month, far above the ~$250/kW all-in retail average, because the rack is priced for space, not power.

So the rule: if your servers are light, buy space. If they're dense, buy power. A half rack with more power can beat a full rack with less.

When each fits

  • 1U to 4U: a few servers, no growth planned, published prices are fine
  • Half rack: 5 to 15 servers at modest power, room to double
  • Full rack: past half full in the first year, or any network gear that wants its own space
  • Multiple racks or a cage: past 10 kW, or anything you'd rather have bid than buy off a price list

Questions

How much does a full rack of colocation cost?

Retail full racks run $900 to $2,000 a month nationally; a published Chicago list price is $1,400 with dual 20A 120V circuits.

Is a half rack worth it?

If you'll use more than about 10U at modest power, usually yes: per U it costs far less than single-U space.

Make facilities bid for it

Send your spec or the renewal notice you just received. At least three facilities that fit bid blind, and every bid comes back on one 36-month cost.

  • Blind until you pick: facilities never see your name, email, company or files.
  • Every bid on one basis: rent, power model, cross-connects, escalators and SLA credit caps.
  • You sign direct with the facility. Participating providers pay our desk a placement commission when a buyer we introduce signs. It never changes their price or how we rank them.
See live price index

Blind colocation counter-quotes

At least three facilities bid against your spec. Reply within one business day.

PDF, PNG, JPG or WebP. Redact your company name and IP blocks if you like: we need power, space, cross-connects, price and dates.

Single point of contact. Providers bid blind: they see the technical spec only, never your name, email, phone or company, and never a file you upload. We introduce you only to the provider you pick.

© 2026 Wells Software Consulting LLC. Market figures are public benchmarks shown with their sources and dates, not offers. Facility and operator names belong to their owners; RentColocation.com is not affiliated with any operator listed.