Skip to content

AI and GPU colocation: density, cooling and a delivery date in writing

GPU racks run at 30 to 100+ kW. Facilities that can commit that density, the cooling for it and a ready date bid blind on your spec, and every bid comes back on one 36-month cost.

Blind colocation counter-quotes

At least three facilities bid against your spec. Reply within one business day.

PDF, PNG, JPG or WebP. Redact your company name and IP blocks if you like: we need power, space, cross-connects, price and dates.

Single point of contact. Providers bid blind: they see the technical spec only, never your name, email, phone or company, and never a file you upload. We introduce you only to the provider you pick.

Rack density, from the server up

DGX H100 systems per rack, at 10.2 kW and 8U each.

GPU rack density
ServersPeak drawSpaceWhat it needs
1 per rack10.2 kW8UHigh density, air with containment or rear-door cooling
2 per rack20.4 kW16UHigh density, air with containment or rear-door cooling
3 per rack30.6 kW24UHigh density, air with containment or rear-door cooling
4 per rack40.8 kW32ULiquid-assisted cooling, confirm in writing
5 per rack51.0 kW40ULiquid-assisted cooling, confirm in writing

NVIDIA, DGX H100/H200 user guide: introduction and specifications. Network switches and storage add to each rack.

What a circuit delivers

Usable kW at an 80% continuous load, and how many 10.2 kW servers each feeds.

Circuit capacity
CircuitUsableDGX H100s
208V single-phase, 30A5.0 kW0
208V three-phase, 30A8.6 kW0
208V three-phase, 60A17.3 kW1
415V three-phase, 32A18.4 kW1
415V three-phase, 60A34.5 kW3
415V three-phase, 100A57.5 kW5

kW = volts x amps x 0.8, times 1.732 for three-phase. With 2N power, each rack needs two of these.

Cheapest metered power for a 40 kW rack

At GPU density, power is most of the bill. Metered cost at 70% draw and a billed PUE of 1.4, per rack.

Metered power for a 40 kW rack
MetroIndustrial ratePer month36 months
Houston7.07 cents/kWh$2,023$72,833
Dallas / Fort Worth7.07 cents/kWh$2,023$72,833
Austin7.07 cents/kWh$2,023$72,833
Seattle7.51 cents/kWh$2,149$77,366
Charlotte / Raleigh8.37 cents/kWh$2,395$86,226
Hillsboro / Portland8.92 cents/kWh$2,553$91,892
Salt Lake City9.10 cents/kWh$2,604$93,746
Miami9.17 cents/kWh$2,624$94,467

EIA Electric Power Monthly, Table 5.6.A, July 2026. All 25 metros.

Facilities built for high density, per their operators

High-density facilities
MetroOperatorFacilityBuilt for
HoustonElement CriticalElement Critical Houston HOU1, 22000 Franz Rd, KatyHigh-density and AI/GPU colocation; Element Critical advertises cabinets through private suites and cloud on-ramps to AWS, Azure, Oracle and Google Cloud.Operator
New YorkCoreSiteNY2, 2 Emerson Lane, Secaucus, NJCabinets, private cages and liquid cooling in a purpose-built Tier III site above the 500-year flood plain.Operator
AshburnDigital RealtyACC4, 44480 Hastings Drive, Ashburn, VAData center suites, powered base buildings, build-to-suit and high-density colocation, plus ServiceFabric and Internet Exchange.Operator
AshburnCoreSiteVA1, Reston, VAFull cabinets, private cages and suites (no 1U, 2U or shared cabinets), liquid cooling, direct cloud on-ramps.Operator
AshburnQTSAshburn 1 (DC1), 22271 Broderick Drive, Sterling, VALarge-block capacity: 55 MW+ critical power in DC1, liquid cooling available.Operator
ChicagoDigital RealtyORD10 (350 E Cermak), Chicago, ILData center suites, high-density colocation, cross connects and Internet Exchange in a 1,005,500 sq ft building.Operator
ChicagoDataBankORD1, 600 S Federal St, Chicago, ILCabinet colocation in a carrier hotel; 10 kW+ air-cooled and 25 kW+ liquid-cooled per cabinet.Operator
Salt Lake CityAligned Data CentersSLC-01 (3333 W 9000 S, West Jordan)Large and high-density deployments: liquid cooling loops for GPU workloads, 415V A+B rack distribution, 100% uptime SLA on a 55-acre campus.Operator
Silicon ValleyEquinixSV1, Great Oaks campus, San Jose, CAInterconnection-dense retail colocation with direct access to hyperscalers and AI/cloud providers.Operator
Silicon ValleyCoreSiteSV7, 3020 Coronado Drive, Santa Clara, CARetail colocation on a multi-megawatt campus with cloud on-ramps; liquid cooling and DGX-Ready SV9 for AI.Operator
Silicon ValleyDigital RealtySJC37, 641 Walsh Avenue, Santa Clara, CASuites, high-density colocation and ServiceFabric across 15 Bay Area facilities.Operator
Silicon ValleyH5 Data CentersSilicon Valley, 1360 Kifer Rd, Sunnyvale, CACarrier-neutral colocation with dual meet-me rooms and high-density cooling.Operator
Las VegasSwitchThe Core Campus, Las VegasLarge and high-density deployments: Switch advertises density up to 2 MW per cabinet, 100% renewable power and a 7 ms fiber route to The CITADEL.Operator
AtlantaQTSAtlanta 1 campus (1033 Jefferson St NW, Atlanta)Large-scale and hyperscale capacity: a 99-acre campus listed at 278 MW+ critical capacity with direct fiber access to multiple carriers.Operator
DallasDigital RealtyDFW10, 2323 Bryan St, Dallas, TXSuites, high-density colocation, ServiceFabric and Internet Exchange; larger campuses in Richardson and Lewisville.Operator
DallasAligned Data CentersDFW-01, 2800 Summit Ave, Plano, TXHigh-density and GPU deployments with air, liquid or hybrid cooling in the same hall.Operator
PhoenixAligned Data CentersPHX-01 (2500 W Union Hills Drive, Phoenix)High-density and GPU deployments: air cooling arrays plus DeltaFlow liquid cooling, 415V rack distribution, 100% uptime SLA, on a 55-acre campus.Operator
HillsboroFlexentialPortland - Hillsboro 2 (5737 NE Huffman St, Hillsboro)High-density colocation (up to 80+ kW per cabinet, liquid cooling, 18 MW critical power) with subsea cable connectivity and a 100% SLA.Operator
AustinSwitchData Foundry Austin (multi-tenant colocation acquired 2021)Buyers wanting high-density options and power guarantees: Switch advertises a 100% power uptime guarantee and 100% renewable energy across its Austin sites.Operator
AustinElement CriticalElement Critical Austin AUS1, 8025 North IH-35, AustinCabinets through private suites and high-density colocation; Element Critical advertises carrier-neutral connectivity with cloud on-ramps to AWS, Azure, Oracle and Google Cloud.Operator
MiamiCoreSiteMI2, 2100 NW 84th Ave, DoralHurricane-resilient purpose-built space (CoreSite cites Category 5 design) with liquid cooling and a lit fiber link to MI1.Operator
MinneapolisFlexentialMinneapolis - Chaska, 3500 Lyman Blvd, ChaskaHigh-density and AI workloads: 9 MW, 80 kW+ per cabinet, liquid cooling.Operator
BostonMarkley GroupOne Summer Street, BostonCarrier-hotel access in downtown Boston; cabinet, cage or dedicated suite, including high-density options.Operator
TorontoeStruxtureTOR-1, 151 Front St W, TorontoColocation inside the main carrier hotel with direct TorIX access; eStruxture also offers TOR-3 at 431 Horner Ave for high-density power.Operator
Detroit123NETDC1, 24700 Northwestern Hwy, SouthfieldInterconnection-heavy and high-density deployments: 80,000 sq ft, 20 MW dedicated DTE substation, racks up to 60 kW, DET-iX on site.Operator

GPU colocation questions

How much power does a GPU rack need?

Start from the server. An NVIDIA DGX H100 is 8U and draws up to 10.2 kW (NVIDIA). Four in a rack is about 41 kW before networking, several times a standard cabinet.

Do I need liquid cooling?

Not always. Racks in the 15 to 35 kW range are often air-cooled with containment or rear-door heat exchangers. Above that, ask each facility which method it will commit to, and get the density and cooling written into the order. Liquid cooling colocation.

Which metros are cheapest for GPU power?

Where power is metered, the utility rate drives the bill at high density. The table on this page ranks our metros by metered cost for a 40 kW rack.

How fast can a facility deliver high-density space?

It depends on the building, and it's the line most often left vague. We ask every bidder for a committed delivery date and show it next to the price in your shortlist.

© 2026 Wells Software Consulting LLC. Market figures are public benchmarks shown with their sources and dates, not offers. Facility and operator names belong to their owners; RentColocation.com is not affiliated with any operator listed.