High-density colocation: the power math before the price

Circuits, redundancy and billing models for 20 to 100+ kW racks, and the commitments to get in writing before you sign.

High density starts where a standard cabinet stops. Most retail racks are built for a few kilowatts; GPU and HPC racks need 20, 40 or more. The questions that matter change with it: how much power the facility will commit per rack, how it removes the heat, and when the space is ready.

Start from the circuit

A circuit's usable capacity is its voltage times its amperage times 0.8 for continuous load, times 1.732 if it's three-phase. That's the number to compare with your servers' peak draw, not the breaker size on the quote.

Circuit capacity
CircuitUsableDGX H100s per circuit
208V single-phase, 30A5.0 kW0
208V three-phase, 30A8.6 kW0
208V three-phase, 60A17.3 kW1
415V three-phase, 32A18.4 kW1
415V three-phase, 60A34.5 kW3
415V three-phase, 100A57.5 kW5

Server draw: NVIDIA, DGX H100/H200 user guide: introduction and specifications, 10.2 kW max per 8U system.

With 2N power, every rack gets two feeds and each must carry the full load alone, so you pay for twice the circuit capacity you draw. With N+1, ask how the facility shares the redundant path and what happens to your rack in a single failure.

Density by server count

Density by server count
ServersPeak drawSpaceWhat it needs
1 per rack10.2 kW8UHigh density, air with containment or rear-door cooling
2 per rack20.4 kW16UHigh density, air with containment or rear-door cooling
3 per rack30.6 kW24UHigh density, air with containment or rear-door cooling
4 per rack40.8 kW32ULiquid-assisted cooling, confirm in writing
5 per rack51.0 kW40ULiquid-assisted cooling, confirm in writing

How power is billed at high density

At 30 kW and up, the power line is most of the bill. A breakered contract bills the full circuit whether you draw it or not, so at high density it pays to be precise about committed kW. A metered contract bills what you draw at the facility's billed PUE, so ask for that PUE in writing. An all-in rate hides both: compare it with the metered equivalent before you accept it.

Metered power at high density
MetroIndustrial rate40 kW rack per month36 months
Houston7.07 cents/kWh$2,023$72,833
Dallas / Fort Worth7.07 cents/kWh$2,023$72,833
Austin7.07 cents/kWh$2,023$72,833
Seattle7.51 cents/kWh$2,149$77,366
Charlotte / Raleigh8.37 cents/kWh$2,395$86,226
Hillsboro / Portland8.92 cents/kWh$2,553$91,892
Salt Lake City9.10 cents/kWh$2,604$93,746
Miami9.17 cents/kWh$2,624$94,467

EIA Electric Power Monthly, Table 5.6.A, July 2026; 70% draw, PUE 1.4.

What to get in writing

  • Committed kW per rack, and the circuits that deliver it
  • Cooling method: air with containment, rear-door heat exchangers or direct-to-chip liquid
  • Floor loading for heavy racks
  • The date power and cooling are ready, not just the space
  • The price per kW when you add the next rack

Questions

What counts as high-density colocation?

Anything well above a standard cabinet's few kilowatts. In practice, buyers use the term from about 15 to 20 kW per rack, and GPU racks commonly run 30 to 100+ kW.

Is high-density colocation more expensive per kW?

Usually less per kW on space, because more power fits in the same floor area, but the power and cooling lines grow. Compare on a 36-month landed cost, not on rent per cabinet.

Make facilities bid for it

Send your spec or the renewal notice you just received. At least three facilities that fit bid blind, and every bid comes back on one 36-month cost.

  • Blind until you pick: facilities never see your name, email, company or files.
  • Every bid on one basis: rent, power model, cross-connects, escalators and SLA credit caps.
  • You sign direct with the facility. Participating providers pay our desk a placement commission when a buyer we introduce signs. It never changes their price or how we rank them.
See live price index

Blind colocation counter-quotes

At least three facilities bid against your spec. Reply within one business day.

PDF, PNG, JPG or WebP. Redact your company name and IP blocks if you like: we need power, space, cross-connects, price and dates.

Single point of contact. Providers bid blind: they see the technical spec only, never your name, email, phone or company, and never a file you upload. We introduce you only to the provider you pick.

© 2026 Wells Software Consulting LLC. Market figures are public benchmarks shown with their sources and dates, not offers. Facility and operator names belong to their owners; RentColocation.com is not affiliated with any operator listed.