QTS facilities in 8 of our 25 metros, with the networks on site at each and the other operators that can bid against them.
QTS by metro
| Metro | Facilities | Networks (best building) | Built for, per the operator |
|---|---|---|---|
| New York | Piscataway 1, 101 Possumtown Road, Piscataway, NJ | Large-block capacity, 65 MW+ critical power on a 38-acre campus. | |
| Ashburn | Ashburn 1 (DC1), 22271 Broderick Drive, Sterling, VA | Large-block capacity: 55 MW+ critical power in DC1, liquid cooling available. | |
| Chicago | Chicago 1, 2800 S Ashland Ave, Chicago, IL | Two-building campus near downtown with a second building in development. | |
| Silicon Valley | Santa Clara 1, 2805 Mission College Blvd, Santa Clara, CA | 7.5 MW critical power campus with seismic protection. | |
| Atlanta | Atlanta 1 campus (1033 Jefferson St NW, Atlanta) | Large-scale and hyperscale capacity: a 99-acre campus listed at 278 MW+ critical capacity with direct fiber access to multiple carriers. | |
| Dallas | Irving 1, 6431 Longhorn Dr, Irving, TX | Large-scale campus, 165 MW+ critical capacity across 6 facilities. | |
| Hillsboro | QTS Hillsboro (HIL1) | 11 | Rapid, large-scale deployments: 20 MW+ critical power on a 25-acre campus with an expandable adjacent substation and indirect air-side economizer cooling. |
| Miami | Miami 1, 11234 NW 20th Street, Miami | Buyers with South American and Caribbean network needs; QTS cites Category 5 hurricane resistance (185 MPH) and 2 MW of critical power. |
Networks, exchanges and carriers on site as listed in PeeringDB, captured 2026-10-23. Counts are self-reported by the networks and operators. Facility descriptions link to the operator's own pages from each market page.
Alternatives to QTS
The best-connected buildings run by other operators in the same metros. Any of them can bid in the same round.
QTS questions
In our 25 tracked metros, QTS has facilities in 8: New York, Ashburn, Chicago, Silicon Valley, Atlanta, Dallas, Hillsboro, Miami.
Put QTS in the same bid as the facilities around it. Every bid lands on one 36-month cost: rent, power model, cross-connects, escalators and SLA credit caps, so a low headline rate can't hide the rest.
Often, if the alternatives are real. Upload the renewal notice and we'll get competing bids before your notice deadline; the incumbent can match them or you can move. Renewal counter-quotes.
Make QTS compete
Send your spec or your QTS renewal notice. QTS and the facilities around it bid blind on the same 36-month basis.
- Blind until you pick: facilities never see your name, email, company or files.
- Every bid on one basis: rent, power model, cross-connects, escalators and SLA credit caps.
- You sign direct with the facility. Participating providers pay our desk a placement commission when a buyer we introduce signs. It never changes their price or how we rank them.