Sabey Data Centers colocation: facilities, networks and alternatives
Sabey Data Centers facilities in 3 of our 27 metros, with the networks on site at each and the other operators that can bid against them.
Sabey Data Centers by metro
| Metro | Facilities | Networks (best building) | Built for, per the operator |
|---|---|---|---|
| New York | 375 Pearl, Intergate.Manhattan | 8 | |
| Ashburn | SDC Ashburn, 21741 Red Rum Dr, Ashburn, VA | Modular colo spaces, powered shell and build-to-suit; rated for 100+ kW per rack. | |
| Seattle | Sabey Intergate East Building 4 | 13 |
Networks, exchanges and carriers on site as listed in PeeringDB, captured 2026-11-10. Counts are self-reported by the networks and operators. Facility descriptions link to the operator's own pages from each market page.
Alternatives to Sabey Data Centers
The best-connected buildings run by other operators in the same metros. Any of them can bid in the same round.
| Metro | Other operators' best-connected buildings |
|---|---|
| New York | Digital Realty: Digital Realty NYC (60 Hudson) (162 networks); Digital Realty: Digital Realty NYC (111 8th Ave) (130 networks); Equinix, Inc.: Equinix NY2/NY4/NY5/NY6 - New York, Secaucus (130 networks) |
| Ashburn | Equinix, Inc.: Equinix DC1-DC15,DC21-DC22 - Ashburn (526 networks); CoreSite: CoreSite - Reston (VA1) (85 networks); DataBank, Ltd.: DataBank Ashburn (IAD1) (38 networks) |
| Seattle | Digital Realty: Digital Realty Seattle SEA10 (233 networks); Equinix, Inc.: Equinix SE2/SE3 - Seattle (114 networks); GI Property Management: KOMO Plaza Seattle (Formerly Fisher Plaza) (23 networks) |
Sabey Data Centers questions
In our 27 tracked metros, Sabey Data Centers has facilities in 3: New York, Ashburn, Seattle.
Put Sabey Data Centers in the same bid as the facilities around it. Every bid lands on one 36-month cost: rent, power model, cross-connects, escalators and SLA credit caps, so a low headline rate can't hide the rest.
Often, if the alternatives are real. Upload the renewal notice and we'll get competing bids before your notice deadline; the incumbent can match them or you can move. Renewal counter-quotes.
Make Sabey Data Centers compete
Send your spec or your Sabey Data Centers renewal notice. Sabey Data Centers and the facilities around it bid blind on the same 36-month basis.
- Blind until you pick: facilities never see your name, email, company or files.
- Every bid on one basis: rent, power model, cross-connects, escalators and SLA credit caps.
- You sign direct with the facility. Participating providers pay our desk a placement commission when a buyer we introduce signs. It never changes their price or how we rank them.